• 0

Project Consultancy, Reports & Profiles

 

Why should Start a Business in Zambia?

Here are some of them Zambia has one of the fastest growing economies in Africa and has enjoyed high rates of economic growth for over ten years. According to UNDP’s Human Development Report, Zambia’s gross national income per capita increased from $39 (PPP) in 1980 to $700 (PPP) in making it one of Sub-Saharan Africa’s most rapidly developing countries.

The country is rich in Natural Resources including copper, cobalt, uranium and other precious metals. There are more than 2 million scale businesses in Zambia. Businesses play a vital role providing goods and services. These factors make Zambia an ideal place to start a business. The World Bank classifies a country as being upper middle income when it’s GNI per capita reaches US$1,045.

 

What are the Natural Resources in Zambia?

Mining accounts for 12.5% of GDP and copper is a major export. Other Natural Resources include coal, cobalt, iron ore, bauxite and tantalum. Agriculture is an important part of Zambia's economy. Major agricultural exports include maize and tobacco but other commodities such as sugar, sesame seeds and sunflower seeds are also produced to meet local consumption demand. Food imports amounted to 1.3% of total.

 

What are the Manufacturing Business Opportunities in Zambia?

There are various starting sectors which an individual can venture into upon moving in Zambia. These are: agriculture and forestry, mining and quarrying industry, manufacturing industry, water supply and sanitation, construction (which includes energy), transportation & storage industry and financial services.

Some of these industries have a number of industrial sub-sectors where you can find suitable manufacture businesses. Agriculture is Husbandry, Crop Production and Fisheries while Forestry is divided into Timber Production, Logging and Plywood.

Mining & Quarrying has four sub-sectors namely Copper Mining, Gold Mining, Iron Ore Mining and Limestone Quarrying. Manufacturing sector consists of seven sub-sectors namely Food Processing, Beverages, Textiles and Apparel, Wood Products, Paper Products and Printing.

The Water Supply & Sanitation sector has five sub-sectors namely Sewerage Services, Water Supply Services including Operation and Maintenance Services for Water Treatment Plants. Construction Industry is also made up of several sub-sectors such as Building Construction, Civil Engineering Construction and Infrastructure Construction.

Transportation & Storage Sector covers Air Transport Services, Rail Transport Services, Road Transport Services and Sea Transport Service. Financial services consist of Banking Sector, Insurance Sector and Securities Exchange Market.

 

What Businesses are Successful in Zambia?

There are some industries that struggle in many developing markets because of political or economic instability. The following is a list of successful businesses that are currently being run successfully in Zambia * Retail * Automotive * Agriculture * Mining * Forestry (timber). These industries were have been successful in Zambia.

 

Is Zambia good for business?

Start a business in Africa, there’s no better place than Zambia. The country is growing at an impressive rate—more than 5% per year—and its economy is relatively stable. Yet despite all of these positives, many investors are interested in Zambia.  Market that has tremendous potential for growth and development. According to projections from the World Bank, Zambia will have one of the highest growth rates in sub-Saharan Africa over the years.

 

Business-Friendly Policies and Government Initiatives of Zambia:

The Government of Zambia has adopted several policies and initiated numerous initiatives to encourage a conducive environment for conducting businesses. These include: trade liberalization reforms; a reduction in red tape; an increase of electricity generation capacity and distribution; privatization of state-owned enterprises; tax breaks for investors. There is no doubt that these developments have played a big role towards improving investor confidence.

President Edgar Lung continued policies such as creation of special economic zones (SEZs) and encouraging private sector participation in infrastructure development. It initiated major economic reforms to encourage private sector development, diversify economic activity and attract investment into strategic sectors such as mining, construction and manufacturing.

The country also lowered trade barriers to expand markets. These initiatives have helped attract large-scale investments into several industries like cement production, agricultural processing.

 

Zambia Industrial Infrastructure:

Industrial infrastructure of Zambia is developed and there are large-scale industries of mining (copper, coal and emeralds) and light manufacturing. The service sector comprises 50% of GDP but most employment is concentrated in subsistence agriculture. The country has a wide range of mineral resources including copper, cobalt, uranium and emeralds. There is hydropower development and tourism.

Agriculture accounts for about 30% of GDP. It is also main source of investor earnings through cotton, cashew nuts, sugarcane and tobacco. Rice production accounts for 12% of agricultural .Livestock production accounts for 10%. Exports were US$1 billion while imports were US$1.7 billion with trade deficit at US$0.7 billion.

Imports include machinery, petroleum products, chemicals and transport equipment. Export commodities include gold, timber, coffee and fish. International reserves stood at US$2 billion. The currency is Kwacha which was introduced in 2006 replacing Zambian kwacha (ZMK). Inflation rate stood at 6%.

Bank loans to private sector grew by 23% while annual growth rate of money supply was 9%.  The fiscal policy was expansionary. Government expenditure increased by 19% while tax revenue increased by 15%. Current account balance recorded a surplus of 2%.  Investment was $US 500 million.

 

What are the steps for Starting a Business in  Zambia?

Starting a Business in Zambia steps are mention below:

Check the company name for uniqueness.

The declaration of compliance (Companies Form 11) must be signed by a Commissioner of Oaths.

Obtain a tax ID number.

Register for Social Security.

Register for VAT.

Get an investment registration certificate

Open a bank account.

And get permit license for business.

 

Market size of Zambia:

Zambia is a politically stable, multi-party democracy, rich in Natural Resources. Estimated population of 17.2 million – 42 percent urban population. Positive economic growth for 14 years. Estimates indicate the economy grew by 4.1 percent in 2017, compared to 3.8 percent in 2016.  Among the key sectors, agriculture, tourism, manufacturing, mining, and electricity generation improved from a 2015-2016 slump. In the monetary sector, the Bank of Zambia (BOZ) continued its monetary easing resulting in more commercial bank liquidity. 

Inflation remained within the BOZ’s medium target range of 6-8. The economy enjoys liberalized prices on most items, a stable foreign exchange rate, and no currency controls. In 2017, Zambia’s main export partners was Switzerland which accounted for 44.2 percent of total exports (due more to the location of commodity traders, rather than actual exportation).  Others include: China (14 percent), Singapore, South Africa, and the Democratic Republic of Congo (DRC).  During the same period, Zambia’s main import partner was South Africa followed by DRC, China, Mauritius, and Kenya.

Zambia’s total imports from the United States were $83.9 million.  These consisted primarily of machinery, rubber, and vehicles. $66.1 million in Zambian exports went to the United States.  These consisted almost entirely of copper, cobalt, precious stones (primarily emeralds), and cotton. Zambia is a member of the Southern Africa Development Community (SADC) and the Common Market for Eastern and Southern Africa (COMESA).

 

Industrial Growth of Zambia:

Industrial output in Zambia is dominated by the food, beverages and tobacco sectors. These contributed 67.6 % of manufacturing GDP. The remaining sectors contributed less than 35 % of GDP. Mining, Copper mining and processing contribute over 85% to the country's exports, Agriculture.

Agriculture plays a vital role in the Zambian economy than the mining sector. Tourism is one of the primary and growing sectors in Zambia and Energy. Five factors that spurred industrial growth in the late 1800's are Abundant Natural Resources (coal, iron, oil); Abundant labor supply; Railroads; Labor saving technological advances (new patents) Business government policies.

 

 


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
FERROALLOYS-FERROMANGANESE, SILICOMANGANESE, FERROSILICON BASED ON ALUMINOTHERMIC PROCESS
FERROALLOYS-FERROMANGANESE, SILICOMANGANESE, FERROSILICON BASED ON ALUMINOTHERMIC PROCESS

The primary objective of the study is to review the technological status of ferroalloys industry in the country in the area of bulk production of s... Read More

Capacity :
12 MT/Day, Ferro Manganese –6 MT/Day, Silico Manganese 3 MT/Day, Ferro Silicon 3 MT/Day
Plant and Machinery cost:
75.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
36.00%
Break Even Point (BEP):
79.00 %
TCI :
242.00 Lakhs
Cost of Project :
242.00Lakhs
Add To Inquiry Basket
HIGH CARBON FERROMANGANESE
HIGH CARBON FERROMANGANESE

Ferroalloys are alloys with iron employed to add chemical elements into molten metal, usually during steelmaking. Ferroalloys impart distinctive qu... Read More

Capacity :
15000 MT/Annum
Plant and Machinery cost:
1032.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
42.00%
Break Even Point (BEP):
67.00 %
TCI :
2319.00 Lakhs
Cost of Project :
2319.00Lakhs
Add To Inquiry Basket
Sponge Iron Plant
Sponge Iron Plant

-

Read More
Capacity :
50 MT/Day
Plant and Machinery cost:
1300.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
41.00%
Break Even Point (BEP):
45.00 %
TCI :
1800.00 Lakhs
Cost of Project :
1800.00Lakhs
Add To Inquiry Basket
IRON POWDER FROM MILL SCALE SCRAP
IRON POWDER FROM MILL SCALE SCRAP

Iron powder is used to produce particles in desired range for use in powder metallurgy and metallic pigments. Powder iron made electrolytically mak... Read More

Capacity :
2 MT / Day
Plant and Machinery cost:
23.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
46.00%
Break Even Point (BEP):
46.00 %
TCI :
176.00 Lakhs
Cost of Project :
176.00Lakhs
Add To Inquiry Basket
Growing Prospects for Packaged Drinking Water Industry
Growing Prospects for Packaged Drinking Water Industry

Water everywhere, not a CLEAN drop to drink! Who would have thought that there will be a day when sanitation of available water would be more of a... Read More

Capacity :
30,000 Thousand Nos./Annum or 1,00,000 Bottles /day
Plant and Machinery cost:
105.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
44.00%
Break Even Point (BEP):
63.00 %
TCI :
282.00 Lakhs
Cost of Project :
282.00Lakhs
Add To Inquiry Basket
BENEFICIATION OF CHROMIUM, NICKEL AND MANGANESE ORE
BENEFICIATION OF CHROMIUM, NICKEL AND MANGANESE ORE

Chromium is the 21st most abundant metal in the Earths crust. The only commercial ore of chromium is the chromite. Most chromite ores are rich enou... Read More

Capacity :
30,000 MT/ Annum each ores
Plant and Machinery cost:
896.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
45.00%
Break Even Point (BEP):
49.00 %
TCI :
3528.00 Lakhs
Cost of Project :
3528.00Lakhs
Add To Inquiry Basket
DUCTILE IRON FITTINGS
DUCTILE IRON FITTINGS

There are various processes by which metal can be shaped such as forging, extrusions, pressing, welding, rolling and costing. Among the various pro... Read More

Capacity :
18000 MT / Annum
Plant and Machinery cost:
173.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
45.00%
Break Even Point (BEP):
64.00 %
TCI :
499.00 Lakhs
Cost of Project :
499.00Lakhs
Add To Inquiry Basket
MANGANESE SULPHATE
MANGANESE SULPHATE
Manganese sulphate is commercially one of the most important compounds. It is an important mineral based chemical industry. The main constituent of t... Read More
Capacity :
2.00 MT / Day
Plant and Machinery cost:
31.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
42.00%
Break Even Point (BEP):
41.00 %
TCI :
126.00 Lakhs
Cost of Project :
126.00Lakhs
Add To Inquiry Basket
Bio coal Briquettes from Agricultural Cellulosic Waste
Bio coal Briquettes from Agricultural Cellulosic Waste
Bio coal briquette is an ideal and best ready substitute to coal, fire wood, lignite etc. and easily replaces these conventional fuels for heating,... Read More
Capacity :
16 Ton / Day
Plant and Machinery cost:
23.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
53.00 %
TCI :
89.00 Lakhs
Cost of Project :
89.00Lakhs
Add To Inquiry Basket
VACUUM DISTILLATION OF CRUDE COAL TAR SPECIFICALLY CREOSOTE OIL
VACUUM DISTILLATION OF CRUDE COAL TAR SPECIFICALLY CREOSOTE OIL

For vacuum distillation of crude coal tar, the crude coal tar is produced from coke ovens of steel plant, 50% of this crude coal tar is pitch. The ... Read More

Capacity :
7500 MT / Annum
Plant and Machinery cost:
137.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
43.00%
Break Even Point (BEP):
57.00 %
TCI :
320.00 Lakhs
Cost of Project :
320.00Lakhs
Add To Inquiry Basket
MEDICAL DISPOSABLES: Disposable Syringes (Self Destructive) with Needles, Catheters and Mask
MEDICAL DISPOSABLES: Disposable Syringes (Self Destructive) with Needles, Catheters and Mask

Disposable needle is widely used by ... Read More

Capacity :
0
Plant and Machinery cost:
147.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
43.00%
Break Even Point (BEP):
47.00 %
TCI :
426.00 Lakhs
Cost of Project :
426.00Lakhs
Add To Inquiry Basket
SG Iron (Ductile Iron) and Alloy Steel Casting
SG Iron (Ductile Iron) and Alloy Steel Casting

S. G. Iron (Ductile Iron) and Alloy Steel Casting

There are various processes by w... Read More

Capacity :
18,000 MT/Annum
Plant and Machinery cost:
168.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
43.00%
Break Even Point (BEP):
66.00 %
TCI :
483.00 Lakhs
Cost of Project :
483.00Lakhs
Add To Inquiry Basket
Charcoal From Coconut Shell
Charcoal From Coconut Shell

Charcoal and purity of any substances has now become a basic requirement of any chemical substance. So many products obtained by processing are dir... Read More

Capacity :
5 Tons/day
Plant and Machinery cost:
21.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
45.00%
Break Even Point (BEP):
45.00 %
TCI :
107.00 Lakhs
Cost of Project :
107.00Lakhs
Add To Inquiry Basket
Pentane (Low Boiling Hydrocarbon Varied Application)
Pentane (Low Boiling Hydrocarbon Varied Application)

To make a product suitable for sale, the various contaminants and undesirable constituents contained in the raw gas must be removed. The first step... Read More

Capacity :
Pentane 6462 MT/Annum, Isopentane 5538 MT/Annum, Powder in Megawatt 540 MW/Annum, Residual Natural G
Plant and Machinery cost:
7800.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
42.00%
Break Even Point (BEP):
43.00 %
TCI :
15400.00 Lakhs
Cost of Project :
15400.00Lakhs
Add To Inquiry Basket
Activated Charcoal From Wood
Activated Charcoal From Wood

Activated wood charcoal is a very important chemical widely employed by certain gases and vapours in purification in catalytic chemical reactions a... Read More

Capacity :
15MT/Day
Plant and Machinery cost:
80.00 Lakhs
Working Capital :
113.00
Rate of Return (ROR):
24.13%
Break Even Point (BEP):
62.30 %
TCI :
262.00 Lakhs
Cost of Project :
262.00Lakhs
Add To Inquiry Basket
Manganese from Ferromanganese Alloy Slag Content
Manganese from Ferromanganese Alloy Slag Content

Manganese from Ferromanganese  Alloy Slag Content 30% Read More

Capacity :
5 MT/Day
Plant and Machinery cost:
50.00 Lakhs
Working Capital :
109.00
Rate of Return (ROR):
47.43%
Break Even Point (BEP):
68.36 %
TCI :
226.00 Lakhs
Cost of Project :
226.00Lakhs
Add To Inquiry Basket
Low Carbon Ferromanganese
Low Carbon Ferromanganese

Manganese ores, containing more than 35 % manganese are suitable for the manufacture of high or low grade ferro-manganese. Low carbon ferro mangane... Read More

Capacity :
50 MT/Day
Plant and Machinery cost:
104.00 Lakhs
Working Capital :
885.00
Rate of Return (ROR):
66.12%
Break Even Point (BEP):
40.99 %
TCI :
1129.00 Lakhs
Cost of Project :
1129.00Lakhs
Add To Inquiry Basket
Wooden Furniture (With Mediocre Automation)
Wooden Furniture (With Mediocre Automation)

The term wooden furniture is used for articles of daily use in dwelling house, place of business, public buildings, and includes items such as chai... Read More

Capacity :
20 Articles/Day
Plant and Machinery cost:
13.00 Lakhs
Working Capital :
28.00
Rate of Return (ROR):
42.81%
Break Even Point (BEP):
48.28 %
TCI :
73.00 Lakhs
Cost of Project :
73.00Lakhs
Add To Inquiry Basket
Paper Napkins
Paper Napkins

Tissue paper is often used for wrapping as in jewellery, liquors, fruits and florist trades etc. Napkins are manufactured from tissues. Paper napki... Read More

Capacity :
400 Kgs./ Day
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
43.88%
Break Even Point (BEP):
47.25 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Bicycle Tyres
Bicycle Tyres

Bicycle tyre is the backbone of the cycle industries. There are few numbers of organized manufacturing companies are engaged in the quality grade c... Read More

Capacity :
4000 Nos./Day
Plant and Machinery cost:
36.00 Lakhs
Working Capital :
57.00
Rate of Return (ROR):
59.50%
Break Even Point (BEP):
38.47 %
TCI :
163.00 Lakhs
Cost of Project :
163.00Lakhs
Add To Inquiry Basket
Wooden Furniture
Wooden Furniture

The furniture making is an ancient art in India before centuries. The expertise of India in manufacturing furniture was accepted by all the parts o... Read More

Capacity :
20 Pcs/Day
Plant and Machinery cost:
4.00 Lakhs
Working Capital :
5.00
Rate of Return (ROR):
111.00%
Break Even Point (BEP):
26.99 %
TCI :
13.00 Lakhs
Cost of Project :
13.00Lakhs
Add To Inquiry Basket
SPONGE IRON
SPONGE IRON

Steel is produced through two process routes; the ore based Blast Furnace-LD Converter route or scrap or DRI based electric arc furnace route. The ... Read More

Capacity :
50 MT/Day
Plant and Machinery cost:
1200.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
41.00%
Break Even Point (BEP):
45.00 %
TCI :
1800.00 Lakhs
Cost of Project :
1800.00Lakhs
Add To Inquiry Basket
Cobalt Octoate
Cobalt Octoate

Cobalt Octoate is a very important compound having chemical formulas as such. CH3 | (CH2- CH2- CH2- CH2- CH- COOH)2CO The I.U.P.A.E. (Interna... Read More

Capacity :
30000 Kg/Annum
Plant and Machinery cost:
16.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
40.00%
Break Even Point (BEP):
52.00 %
TCI :
37.00 Lakhs
Cost of Project :
37.00Lakhs
Add To Inquiry Basket
Setup Plant of Super Absorbent Polymer (SAP)
Setup Plant of Super Absorbent Polymer (SAP)

A superabsorbent polymer (SAP) is a type of polymer that has the ability to absorb an... Read More

Capacity :
Super Absorbent Polymer 8,000 MT Per Annum
Plant and Machinery cost:
1200.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
44.00 %
TCI :
0.00 Lakhs
Cost of Project :
2100.00Lakhs
Add To Inquiry Basket
Setup Business of Nano Resin Modified Bulk Composite for Dental Application
Setup Business of Nano Resin Modified Bulk Composite for Dental Application

 

Nano Resin Modifi... Read More

Capacity :
Nano Resin Modified Bulk Composite 2,000 Pcs Per Day
Plant and Machinery cost:
4.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
35.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
96.00Lakhs
Add To Inquiry Basket
Setting up Glass Fiber Reinforced Polymer (GFRP) Rebar Plant
Setting up Glass Fiber Reinforced Polymer (GFRP) Rebar Plant

 

Glass Fiber Reinforced Polymer (GFRP) rebar is an innovative construction material, engineered by embedding ... Read More

Capacity :
Glass Fibre Reinforced Polymer (GFRP) Bar (Size 8mm to 36 mm) 6 MT Per Day
Plant and Machinery cost:
211.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
549.00Lakhs
Add To Inquiry Basket
A Business Plan for Urea from Natural Gas
A Business Plan for Urea from Natural Gas

 

Capacity :
Urea Fertilizer 100 MT Per Day
Plant and Machinery cost:
1600.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
3300.00Lakhs
Add To Inquiry Basket
Start Production of Ferrotitanium Using Induction Furnace
Start Production of Ferrotitanium Using Induction Furnace

Ferrotitanium using induction furnace is a specialized process that involves the melting a... Read More

Capacity :
Ferrotitanium 70 2,500,000 Kgs Per Annum Ferrotitanium 40 2,500,000 Kgs Per Annum
Plant and Machinery cost:
1200.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
35.00 %
TCI :
0.00 Lakhs
Cost of Project :
1600.00Lakhs
Add To Inquiry Basket
Start Production of Biodegradable and Edible Tableware Products (for Animals) Using Rice Husk
Start Production of Biodegradable and Edible Tableware Products (for Animals) Using Rice Husk

Biodegradable and edible tableware products represent a remarkable fusion of innovati... Read More

Capacity :
Biodegradable and Edibile Tableware Products (Plate, Bowl & Cups) 72,000 Pcs Per Day
Plant and Machinery cost:
341.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
65.00 %
TCI :
0.00 Lakhs
Cost of Project :
583.00Lakhs
Add To Inquiry Basket
Start Business of Sorbitol
Start Business of Sorbitol

Sorbitol is a type of sugar alcohol that is widely used as a sweetener in various foo... Read More

Capacity :
Sorbitol 6 MT Per Day
Plant and Machinery cost:
431.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
790.00Lakhs
Add To Inquiry Basket
A Business Plan For Sodium Silicate from Silica and Soda Ash
A Business Plan For Sodium Silicate from Silica and Soda Ash

Sodium silicate, commonly known as water glass, is a versatile compound with applications acros... Read More

Capacity :
5,000 MT Per Annum
Plant and Machinery cost:
334.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
808.00Lakhs
Add To Inquiry Basket
Manufacturing Business Of Blood Bags
Manufacturing Business Of Blood Bags

Blood bags are containers designed to store and transport blood and other related pro... Read More

Capacity :
Blood Bags 10,000 Nos per day
Plant and Machinery cost:
291.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
75.00 %
TCI :
0.00 Lakhs
Cost of Project :
1092.00Lakhs
Add To Inquiry Basket
A Business Plan For Nicotine From Tobacco Waste
A Business Plan For Nicotine From Tobacco Waste

Nicotine is a naturally occurring chemical compound that is f... Read More

Capacity :
Nicotine 100ml bottle each 3,500 Bottles per day
Plant and Machinery cost:
244.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
1662.00Lakhs
Add To Inquiry Basket
65 Good Profitable Ideas to Start Small-Scale Manufacturing Business in Nepal
65 Good Profitable Ideas to Start Small-Scale Manufacturing Business in Nepal

An exhaustive manual that o... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan Nonwoven Fabric For Mattress
A Business Plan Nonwoven Fabric For Mattress

 

Nonwoven fabric f... Read More

Capacity :
Nonwoven Fabric 400,000 Sq.mtrs. per day
Plant and Machinery cost:
797.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
42.00 %
TCI :
0.00 Lakhs
Cost of Project :
2297.00Lakhs
Add To Inquiry Basket
Start Business Of Cashew Nut Processing With Value Added Products (Roasted Cashew, Fried Cashew, Flavored Cashew, Coated Cashew)
Start Business Of Cashew Nut Processing With Value Added Products (Roasted Cashew, Fried Cashew, Flavored Cashew, Coated Cashew)

 

A variety of meth... Read More

Capacity :
-
Plant and Machinery cost:
276.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
67.00 %
TCI :
0.00 Lakhs
Cost of Project :
878.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business Of Semi Processed Canned Vegetable (Chickpeas & Red Kidney Beans)
Start Manufacturing Business Of Semi Processed Canned Vegetable (Chickpeas & Red Kidney Beans)

Semi Processed Canned Veget... Read More

Capacity :
Canned Chickpeas 1 Kg each 5,000 Th.Packs Per Annum Canned Red Kidney Beans 1 Kg each 5,000 Th.Pa
Plant and Machinery cost:
271.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
1398.00Lakhs
Add To Inquiry Basket
Business Plan For Silica From Rice Husk Ash
Business Plan For Silica From Rice Husk Ash

Silica is a mineral compound composed of silicon and... Read More

Capacity :
-
Plant and Machinery cost:
746.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
23.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
1327.00Lakhs
Add To Inquiry Basket
Start Production of Activated Carbon From Bamboo
Start Production of Activated Carbon From Bamboo

 

Activated carbon ... Read More

Capacity :
Activated Carbon 750 MT per Annum
Plant and Machinery cost:
196.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
50.00 %
TCI :
0.00 Lakhs
Cost of Project :
546.00Lakhs
Add To Inquiry Basket
A Business Plan For Light Weight Bricks (EPS Bricks)
A Business Plan For Light Weight Bricks (EPS Bricks)

Light weight bricks, also k... Read More

Capacity :
EPS Light Weight Bricks 200 Cu.Mt. Per Day
Plant and Machinery cost:
25.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
31.00 %
TCI :
0.00 Lakhs
Cost of Project :
737.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business Carton Boxes
Start Manufacturing Business Carton Boxes

Carton boxes, also known as corrugated boxes, are commonly us... Read More

Capacity :
Carton Boxes 20 MT Per Day
Plant and Machinery cost:
213.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
1023.00Lakhs
Add To Inquiry Basket
Start Business Of Recycled Polyester Fiber From Used PET Bottles
Start Business Of Recycled Polyester Fiber From Used PET Bottles

Recycled polyester fiber is... Read More

Capacity :
Recycled Polyester Fiber 5,000 Kgs. Per Day
Plant and Machinery cost:
68.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
552.00Lakhs
Add To Inquiry Basket
A Business Plan  Copper Cathode From Copper Scrap
A Business Plan Copper Cathode From Copper Scrap

Copper cathode is a pure form of copper metal that is produce... Read More

Capacity :
Copper Cathode 1,800 MT Per Annum Copper Slag, Residue 180 MT Per Annum
Plant and Machinery cost:
202.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
954.00Lakhs
Add To Inquiry Basket
Start  Electrolytic Manganese Dioxide Business
Start Electrolytic Manganese Dioxide Business

Electrolytic Manganese Diox... Read More

Capacity :
Electrolytic Manganese Dioxide 5 MT Per Day
Plant and Machinery cost:
89.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
576.00Lakhs
Add To Inquiry Basket
Setup Sitagliptin (API) Business
Setup Sitagliptin (API) Business

 

Sitagliptin API, ... Read More

Capacity :
Sitagliptin 10 MT Per Day By Products 10 MT Per Day
Plant and Machinery cost:
377.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
5217.00Lakhs
Add To Inquiry Basket
Start Cardanol Business From Cashew Nut Shell Liquid
Start Cardanol Business From Cashew Nut Shell Liquid

Cardanol is a naturally occ... Read More

Capacity :
Cardanol 30 MT Per Day
Plant and Machinery cost:
186.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
710.00Lakhs
Add To Inquiry Basket
Start Business Of Cold Storage
Start Business Of Cold Storage

Cold storage refers to a me... Read More

Capacity :
Fruits, Vegetables, Pulses & Spices Store 5000 MT
Plant and Machinery cost:
132.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
713.00Lakhs
Add To Inquiry Basket
Start Layer Feed Production
Start Layer Feed Production

Layer feed is a specially formulated feed given to laying hens to ensure their ... Read More

Capacity :
-
Plant and Machinery cost:
234.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
1655.00Lakhs
Add To Inquiry Basket
Start Manufacturing Of Safety Shoes
Start Manufacturing Of Safety Shoes

Capacity :
Safety Shoes 2,000 Pairs Per Day
Plant and Machinery cost:
113.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
672.00Lakhs
Add To Inquiry Basket
Start IV Cannula Manufacturing Unit (Pen Style)
Start IV Cannula Manufacturing Unit (Pen Style)

An IV (Intravenous) Cannula, particularly the "Pen Style," is a medical device used for admini... Read More

Capacity :
-
Plant and Machinery cost:
1284.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
5103.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business Of  Disposable Plastic Syringes
Start Manufacturing Business Of Disposable Plastic Syringes

Disposable plastic syringes... Read More

Capacity :
-
Plant and Machinery cost:
245.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
37.00 %
TCI :
0.00 Lakhs
Cost of Project :
1811.00Lakhs
Add To Inquiry Basket
Start Business of Solid Rubber Tyres
Start Business of Solid Rubber Tyres

 

Read More

Capacity :
-
Plant and Machinery cost:
1234.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
35.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
4428.00Lakhs
Add To Inquiry Basket
Opportunity in Paint Rollers Business
Opportunity in Paint Rollers Business

 

Paint rollers are... Read More

Capacity :
Paint Roller 12,000 Pcs. Per Day
Plant and Machinery cost:
73.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
396.00Lakhs
Add To Inquiry Basket
Start Manufacturing of Particle Board (Wood Base)
Start Manufacturing of Particle Board (Wood Base)

Particle board, also known ... Read More

Capacity :
Particle Board (Wood Based) 3,600 Nos Per Day
Plant and Machinery cost:
1630.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
50.00 %
TCI :
0.00 Lakhs
Cost of Project :
3137.00Lakhs
Add To Inquiry Basket
Invest In Potato Starch & Flakes Industry
Invest In Potato Starch & Flakes Industry

Potato starch is extracted throug... Read More

Capacity :
Potato Starch: 7,000 Kgs Per Day Potato Flakes: 5,000 Kgs Per Day
Plant and Machinery cost:
203.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
877.00Lakhs
Add To Inquiry Basket
Start your own Blood Lancet and Insulin Pen Needle Manufacturing Business
Start your own Blood Lancet and Insulin Pen Needle Manufacturing Business

Disposable blood lancet &am... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Business Plan on Hexamethoxymethyl Melamine Resin (HMMM)
Business Plan on Hexamethoxymethyl Melamine Resin (HMMM)

The chemical family of mela... Read More

Capacity :
8 MT per day
Plant and Machinery cost:
280.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
745.00Lakhs
Add To Inquiry Basket
Detailed Project Report on Cellulosic Cellophane Film
Detailed Project Report on Cellulosic Cellophane Film

CNF (cellulosic cellophane ... Read More

Capacity :
6 MT per day
Plant and Machinery cost:
310.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
22.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
681.00Lakhs
Add To Inquiry Basket
Setup E-Waste Recycling Plant
Setup E-Waste Recycling Plant

Electronic wastes are super... Read More

Capacity :
Plastic:1.28 MT/day Ferrous Material:0.80 MT/dayAluminium:0.56 MT/dayGlass:0.80 MT/day Copper:0.56 M
Plant and Machinery cost:
87.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
371.00Lakhs
Add To Inquiry Basket
Set up Bamboo Fiber and Yarn Manufacturing Unit A Complete Business Plan
Set up Bamboo Fiber and Yarn Manufacturing Unit A Complete Business Plan

 

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Start a Production Of Com... Compressed Bio Gas 6 MT Per Day Spent Slurry as Manure 60 MT Per Day 27.00 522.00
Start Industry Of Craft B... Craft Beer (Bottles 650 ml Size) 3,847 Bottles per day Craft Beer (Al. Cans 500 ml Size) 5,000 Bot 27.00 2007.00
Setup plant of Acetate T... Acetate Tow 8 MT Per Day 29.00 1426.00
Setup Plant Of Titanium ... Titanium Dioxide 4 MT Per Day 27.00 1455.00
Setup Plant Of Lab Cultu... Lab Cultured Diamonds (1 Carat) 30 Carat Per Day 25.00 361.00
Start Lemon Processing Un... Lemon Juice Dry Powder 104 Kgs per day Lemon Peel Oil 40 Kgs per day Lemon Pectin 140 Kgs 25.00 314.00
Solar PV (Photovoltaic) G... Solar PV (Photovoltaic) Glass 90,000 MT Per Annum 28.00 4200.00
A Business Plan For Pea P... Pea Protein Isolate 2 MT Per Day Spent Pea for Cattle Feed by Product 8 MT Per Day 27.00 614.00
Setup Plant Of Acrylate... Acrylate Resins 10,000 MT Per Annum Acrylate Emulsions 10,000 MT Per Annum 30.00 2291.00
Start Latex Rubber Thread... Latex Rubber Thread 200 Kg. Per Day 26.00 412.00
Start Cosmetic Unit (Seru... - 36.00 1617.00
Pioneering Pea Protein Bu... 0 0.00 0.00
Start Production Of Silic... - 28.00 4716.00
A Business Plan for IV Fl... IV Fluids (500 ml Size Pack) 78,000 Packs Per Day 27.00 1263.00
Start Industry of Liquor ... Wine (750 ml Size) 4,000,000 Bottles per annum Whiskey (375 ml Size) 4,000,000 Bottles per annum B 28.00 1880.00
Setup Pharmaceutical Unit... - 37.00 35774.00
Start Industry with Serum... 0 0.00 0.00
Setup Unit Of Cement Plan... Cement Plant 40,000 Bags per Day 26.00 25200.00
A Business Plan for Steri... Sterial Water for Injection 500 ml Size Pack 20,000 Sachets Per Day 30.00 1234.00
Setup Plant Of Lead From ... Lead Ingot 30 MT Per Day 28.00 2231.00
A Business Plan Blood Col... - 28.00 2294.00
A Business Plan for Parac... Paracetamol Powder 7 MT Per Day 27.00 779.00
Start Manufacturing Busin... Baby Diapers (4 Pcs.) 84,000 Pkts Per Day Adult Diapers (4 Pcs.) 18,000 Pkts Per Day Sanitary 29.00 4201.00
Start Tissue Paper Manufa... Tissue Paper 20 MT Per Day 27.00 2101.00
Launching a Solar Panel ... Solar Panel 500 MW per annum 32.00 5353.00
Biodegradable Disposable ... - 27.00 2774.00
Setup Curcumin Extraction... Curcumin Powder 100 Kgs per day Turmeric Oil 47 Kgs per day Deoiled Turmeric 1,853 Kgs 28.00 491.00
Setup Active Pharmaceutic... Paracetamol 10,000 Kgs Per Day Azithromycin 10,000 Kgs Per Day Metformin 10,000 Kgs 33.00 5246.00
A Business Plan For Sanit... Sanitary Napkins 4,800 PKTS per day 27.00 84.00
Start Manufacturing Of Bl... - 32.00 985.00
12345678910...

Showing 241 - 300 of 693 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR